Profitability Rises by 4.82% as Company Marks Expansion in Pipeline Projects

Karachi: The unaudited financial statement for the period ending on September 30, 2026, reveals an increase in profit for the Company, as reported on November 27, 2026. The Company's profit after tax rose to Rs. 3,612 million, up from Rs. 3,446 million during the same period last year, marking a significant move with an increase of 4.82%. The earnings per share (EPS) also saw an upward trend, increasing to Rs. 5.70 from Rs. 5.43 in the corresponding period of the previous year.

According to information available from the Pakistan Stock Exchange (PSX), the Company's profit before accounting for minimum tax and income tax stood at Rs. 5,734 million, with a provision of Rs. 2,122 million for these taxes. The reduction in unaccounted-for gas (UFG) losses, from 6,190 MMCF (4.67%) in the previous year to 3,942 MMCF (3.53%) in the current period, and a decrease in the Super tax rate from 10% to 8%, were significant contributors to the profit increase.

Despite facing economic challenges and financial constraints, the Company has maintained a steady stream of profitability. The Board of Directors, management, and staff express confidence in continued performance improvements in the coming years.

For the first quarter ending September 30, 2026, the Company reported successful expansion of its gas supply services, having laid 54.99 kilometers and commissioned 3.866 kilometers of transmission pipelines. Additionally, 325 kilometers of distribution mains were laid, with 240 kilometers commissioned to improve pressure and extend gas facilities to RLNG consumers.

The Company is actively working on several key projects to enhance its transmission infrastructure. Current projects include the construction of a 24-inch diameter pipeline stretching 63.5 kilometers from CV-25 to MP 15.03 near Mandra, aimed at debottlenecking and enhancing operational flexibility. Another ongoing project involves a 12-inch diameter, 103-kilometer pipeline from DI Khan to Manjuwal for the Kot Palak Project. Rehabilitation and protective measures are also underway for flood-affected pipeline sections near Jalalpur Pirwala, Multan.

The Company remains committed to strengthening its infrastructure and expanding its services amidst challenging economic conditions.