Material Information of Oilboy Energy Limited

Karachi, Oilboy Energy Limited informed Pakistan Stock Exchange that the Company has obtained a Petrol Pump on lease situated at Lahore Sheikhupura Road for a period of Fifteen Years in line with the Memorandum of Association of the Company.

Drekkar Kingsway Limited was registered on June 28, 1993 as Private Limited Company and was subsequently converted into Public Limited Company as on June 29, 1994. The principal activity of the company was manufacturing of all type of electrical appliances, cosmetics, toiletries, leather goods, machinery, components and parts.

In 1996, the company sold its plant and machinery. The company is currently engaged in making equity investments in undervalued profitable situations.

The total numbers of shares are 10,000,000. The (0.68) in 2020 which was (0.07) in 2019. The Company had a loss of Rs. 6,809,000 in 2020 which was 716,000 in 2019.